Skip to content

Shelter design

Shelter concept, design and sheltering plan for new buildings under Regulation No. 50. The calculator shows whether a shelter is required and its size.

New service

Shelter design and consulting

Since 1 July 2026, larger new buildings in Estonia must include a shelter, and both new and existing buildings must have a sheltering plan. The field is new: the requirements are strict, experience is scarce, and a shelter affects the space programme, structure and building services.

We help developers understand what the requirement means for space, cost and schedule before design starts, and we design shelters as spaces that are used every day rather than a cost that sits empty.

A Fireplan specialist took part in preparing the Government regulations that set the shelter requirements and co-authored the V1-class shelter design guide (RT 103898-et) led by the Estonian Academy of Security Sciences. We know how the requirements are meant to be interpreted. In 2026 we have designed three major shelters.

Shelter, shelter space and sheltering plan

All three can be provided in both new and existing buildings. What differs is what is mandatory.

Shelter

A building or part of a building built for sheltering, whose structure protects people from explosions and blast waves, flying objects and air pollution, including ionising radiation.

New building

Mandatory when erecting a building whose permit application or notice is submitted from 1 Jul 2026 and which meets Annex 1

Existing building

Possible not mandatory, also not for extensions up to 33% or reconstruction; a shelter can be built voluntarily

Shelter space

A structure or part of one, or a temporary structure, adapted for sheltering and protecting at least from objects scattered by an explosion. Intended for stays of up to 12 hours.

New building

Possible does not replace a shelter where one is required; can be planned voluntarily in other buildings

Existing building

Mandatory where possible if there is no shelter – by 1 Jul 2028 with an occupancy permit, otherwise when applying for it

Sheltering plan

A document describing the general sheltering arrangements: a layout of the shelter or shelter space, how it is brought into use in stages, and the person responsible.

New building

Mandatory for buildings with a shelter requirement, when applying for the occupancy permit, in line with the building design

Existing building

Mandatory for buildings with an occupancy permit meeting the shelter criteria, by 1 Jul 2027, even if sheltering is not possible

Who must comply

  • From 1,200 m² net enclosed area: apartment buildings, dormitories and care facilities, accommodation, catering, office, retail and service buildings, and educational, healthcare, cultural and sports buildings
  • From 1,500 m² industrial buildings; warehouses are exempt
  • Public shelter in buildings visited by crowds because of their use (under Annex 1, for example hotels, catering and retail buildings, stations and ports, theatres, sports halls, ice rinks and places of worship) and in buildings with a net enclosed area of at least 10,000 m² (Crisis Situations and National Defence Act § 95(4))
  • Mixed use – if part of a building of at least 1,200 m² has the requirement, it applies to the whole building; the shelter is sized by the area of that part
  • Shared shelter may serve several nearby buildings if the protective door is within 250 m of the farthest building’s entrance; it must be ready when the first building is put into use
  • Size usually 1–2% of net enclosed area, or 80% of users in schools, hospitals and care facilities; at least 0.75 m² per person

Deadlines

  1. 1 Jul 2026The shelter requirement applies when a building is erected and the building permit application or notice is submitted on or after this date. It does not apply to extensions of up to 33% or reconstruction.
  2. 1 Jul 2027Buildings with an occupancy permit that meet the shelter criteria must have a sheltering plan. Buildings without a permit prepare one when applying for it.
  3. 1 Jul 2028Buildings with an occupancy permit and no shelter adapt a shelter space where possible. Buildings without a permit: when applying for it.

What a shelter must provide

  • Enclosing structures that withstand a blast load of at least 100 kN/m² (V1, up to 180 people) or 200 kN/m² (V2, 181–1,000 people)
  • Brought into use within 72 hours of a Government decision and usable as intended for at least three consecutive days
  • A ventilation system that filters incoming air, keeps an overpressure of at least 50 Pa and runs independently of the grid for at least 72 hours
  • An airlock, a manually closable protective door, and an entrance route with a separately located emergency exit route
  • Inspection by the owner at least once a year and a more thorough one at least once every ten years, recorded in the sheltering plan
  • Signage under Annex 2 of the regulation: an orange square with a blue triangle and the word “VARJUMISKOHT”

How a shelter project works

  1. Preliminary assessment and consultationWe establish whether a shelter is required and of what type, how many occupants it must hold, and how it affects the space programme and budget.
  2. Shelter conceptTogether with the architect, we define the shelter’s location, capacity and everyday use, for example as a gym, classroom or similar room.
  3. Shelter designWe prepare the shelter design as part of the building design and coordinate it with the structural and building services engineers.
  4. Sheltering plan and user guideWe prepare the sheltering plan and an inspection and maintenance plan for the owner.

Shelter and sheltering plan calculator

New building: whether and how large a shelter is required and when the sheltering plan is due. Existing building: deadlines for the sheltering plan and shelter space, and the required shelter space area. Based on Annex 1 of Estonian Government Regulation No. 50 of 8 May 2026.

The use and net enclosed area are listed in the Estonian building register (ehr.ee) under the building’s data. For a new building, take them from the architect’s concept. The result shows the obligation and minimum shelter size; the exact area and location are set in the design.

Building

Preliminary calculation based on Annex 1 of Regulation No. 50 and guide RT 103898-et; it does not replace an expert opinion. A new building means erecting a building whose permit application or notice is submitted from 1 Jul 2026; extensions up to 33% and reconstruction carry no shelter requirement. If part of a building of at least 1,200 m² has the requirement, it applies to the whole building and the shelter is sized by the area of that part. Content verified 31 Oct 2026, responsible: Priit Pääso.

Based on the Estonian Crisis Situations and National Defence Act (§§ 95–97), Government Regulation No. 50 of 8 May 2026 (version in force from 1 Oct 2026) and the V1-class shelter design guide RT 103898-et. The calculator gives a preliminary result; the requirement does not apply to temporary structures. Content verified 31 Oct 2026, responsible: Priit Pääso.

Frequently asked questions

Didn’t find your answer? Write to us at info@fireplan.ee.

When should a fire safety specialist join the project?

Ideally at concept stage. That is when fire safety principles, such as the number of stairwells, fire compartments and the shelter location, can be built into the architecture before changes become expensive.

Does my new building need a shelter?

If the building permit or notice application is submitted on or after 1 July 2026 and the net enclosed area is at least 1,200 m² (1,500 m² for industrial buildings), a shelter is generally required. If the building is visited by crowds or its net enclosed area is at least 10,000 m², the shelter must be public. There is no requirement for, e.g., single-dwelling houses, terraced houses, car parks, warehouses, indoor pools, agricultural buildings or temporary structures. Use our shelter calculator for the result and the required shelter size.

How large must a shelter be?

The effective shelter area is usually 2% of the building’s net enclosed area (1% for some building types), after deducting car parks, plant rooms and unheated attics. In schools, hospitals and care facilities it is based on 80% of the design number of users. Each person needs at least 0.75 m², and the effective shelter area cannot be smaller than 15 m². The airlock, ventilation equipment, toilets and service area are not included in it, so the total shelter area is larger. Up to 180 people require a V1-class shelter; 181–1,000 people a V2-class shelter.

What is the difference between a shelter and a shelter space?

A shelter protects people from explosions and blast waves, flying objects and air pollution, including ionising radiation, and must meet the construction requirements of Regulation No. 50. A shelter space is an adapted room that protects at least from objects scattered by an explosion, is fully or partly below ground or on the ground floor, and is intended for stays of up to 12 hours. Where possible, at least 0.75 m² per person is planned. Both can be public or non-public.

Is there a design guide for shelters?

Yes. The V1-class shelter design guide RT 103898-et (version 2, 30 Sep 2026) was produced under the lead of the Estonian Academy of Security Sciences together with industry experts. It explains the requirements of Regulation No. 50 and gives example solutions. Its recommendations are advisory; legal requirements are mandatory. A Fireplan specialist took part in preparing it.

Can a shelter be built in an existing building?

Yes. There is no obligation to build a shelter in an existing building, also not for extensions of up to 33% or reconstruction, but the owner may build one voluntarily. To count as a shelter, the room must meet the shelter requirements of Regulation No. 50. Existing buildings that meet the shelter criteria must have a sheltering plan and, where possible, a shelter space.

What is a sheltering plan and who prepares it?

A sheltering plan describes the general sheltering arrangements, includes a layout of the shelter or shelter space and how it is brought into use in stages, and names the person responsible. The building owner prepares it; in an apartment association the board approves it. Buildings with an occupancy permit meeting the shelter criteria need one by 1 July 2027, others when applying for the permit. It is reviewed at least once every five years. Existing buildings that meet the shelter criteria must have one by 1 July 2027, and new buildings by the time of the occupancy permit. A plan is required even if sheltering in the building is not possible. We prepare sheltering plans for both new and existing buildings.

Can a shelter be used every day?

Yes. A shelter does not have to be an empty room: it can be designed as a gym, classroom or similar room, provided it can be cleared and brought into use as a shelter when needed. The owner must bring the shelter into use within 72 hours of a Government decision (Crisis Situations and National Defence Act § 95(8)). Dual use should be planned at concept stage.

How much does fire safety design or a shelter design cost?

The price depends on the size and use of the building and the design stage. Send us a description of the building and any existing drawings and we will prepare an exact quote.

Let’s talk about your project

Send a short description and drawings if available. We will define the scope and prepare a quote. See what to include in our checklist (PDF).

Direct contact

+372 507 8370
info@fireplan.ee

Quotes and proposals: Priit Pääso, CEO

Fireplan OÜ
Veskiposti 2 (Electra building), 10138 Tallinn, Estonia
Registry code 14552826
VAT EE102177763

What to include

  • Site address and building use
  • Number of storeys, height and net enclosed area
  • Design stage and desired deadline
  • Drawings in PDF or DWG, if available